Design Coordination

  • Selecting and Assigning the Design, Engineering and Consultancy Firms
    • Preparing the Design Terms of Reference (ToR)
    • Reviewing the Facility Requirements Plan (FRP)
    • Defining the Design Performance Criteria
    • Preparing the Request for Proposals, the Technical and Administrative Specifications and the Design Draft Contract Files
    • Tendering, Evaluation, Commending and Reporting
    • Determining the Employer’s Design Consultants
  • Design Coordination
    • Creating the Documents Delivery and Management System
    • Design Quality Plan Review and Approval
    • Design Work Schedule Review and Approval
    • Management of Value Analysis/Value Engineering (VA/VE) Works
    • Management and Reporting of Coordination Meetings
    • Contract Management, Review and Reporting of Claims
    • Review and Approval of Design Progress
    • Review and Approval of Design Products
    • Review and Approval of Registry Certification Projects
    • Material Selections in the Design Phase
    • Review and Approval of Technical Specifications of Execution and the Bill of Quantities and Measurements
    • Review and Approval of Tendering Documents
  • BIM, ERP, Green Building Integration Services
    • ERP System Consultancy
      • Determining Corporate Needs
      • Selecting the System and the Consultants
      • Monitoring, Auditing and Reporting of the Process
    • BIM System Consultancy
      • Assessment of the Maturity Level of the Organization and the Project
      • Preparing the BIM Execution Plan (BEP) and the BIM Protocol
      • Review and Approval of the Library and the Coding Structure
      • Monitoring, Auditing and Reporting of the Process
    • Green Building (LEED/BREEAM) Consultancy
      • Selecting the Green Building System and the Consultants
      • Application Monitoring and Design Coherence Reporting
      • Certification Coherence Monitoring and Reporting
    • Consultancy for Obtaining the Legally Required Permissions
      • Identifying the Permission Requirements
      • Selecting the Consultants
      • Monitoring, Auditing and Reporting of the Process