The construction of the CityStar project comprising office, shopping centre and residence blocks, which Aral Group, one of Azerbaijan’s largest real estate developers has started in the centre of the capital Baku, continues. The project presently continues on a land of 260,000 m2 with the diaphragm walls, excavation and foundation piles construction works. As the base piling, sheet piling, jet grouting works in the City Star project are executed by Temeltaþ, the selection process for the main contractor is in progress. While PY Consulting International has undertaken the project management and consultancy works of the CityStar, the following firms have undertaken the architecture, engineering and consultancy works of the project:
Architectural Design: Murat Kader, 2Design Structural Design: Tuncel Engineering Inc. Mechanical Design: Moskay Engineering Inc. Electrical Design: HB Teknik Inc. Infrastructural Design: Tempo Engineering Inc. Fire Consultants: Karina Ltd. Geotechnical Consultants: Enar Engineering Ltd. Shopping Center Operation Consultants: Jones Lang Lasalle-TR

The project is expected to be completed in 30 months in total. This most prestigious project in Baku comprises two 40-level A-Class office-building towers, a shopping centre on 60,000 m2, and four residence blocks again on a total of 60,000 m2. The CityStar project, which is built on a total land of 260,000 m2, includes a pool, playgrounds, tennis courts, gardens, education and entertainment centres, and cinema halls in addition to the office, residence and shopping centre functions and constitutes the first phase of the urban development project on a total land of 6 hectares.
|